Home Education Membership Skills Training
 
You are here: PublicationsEdited on: 2024-06-05

Publications:


Copyright of the papers below rests with a variety of different parties. They are made available solely on the same basis that I would supply a single copy of a paper to an individual. It is up to you to ensure that your use of a paper does not infringe copyright law.

Book Publications:

     Published:

Journal Publications:

     Published:

  1. Shihman, A.; Faghihi, S.V.*, Gholipour, Y. (2024). “A Comparative Analysis of Effective Health, Safety, and Environment (HSE) Factors in Building Projects in Different Countries,” Operational Research in Engineering Sciences: Theory and Applications (ORESTA), 7(1), pp. 241-266, DOI: 10.31181/oresta/070112
  2. Jadidoleslamia, S.; Azizi, M.; Faghihi, V. (2024) “A Scoping Review of Literature Review Practices in Construction and Project Management Research,” Journal of Structural and Construction Engineering, (under publication), DOI: 10.22065/JSCE.2023.405448.3166 (in Persian)
  3. Azizi, M.; Taheripour, S.; Faghihi, V. (2024). “Cost-Benefit Analysis of Building Information Modeling Implementation in Construction Projects: Evidence from Iran,” Iran Journal of Computer Science, 7(2), DOI: 10.1007/s42044-024-00182-z
  4. Shoraka, M.; Eshtehardian, E.; Faghihi, V.; and Azizi, M. (2022) “Feasibility Study of Using Virtual Reality with Emphasis on Reducing the Cost of Finishing in Residential Projects (Case study: Construction projects in Districts 1 to 3 of Tehran),” Journal of Structural and Construction Engineering, 10(1), DOI: 10.22065/JSCE.2022.302482.2556 
  5. Sadeghi, N. and Faghihi, V. (2022). “BIM-based Energy Performance Evaluation of Building Envelope.” Journal of Green Building.17(3) pp. 227-258, DOI: 10.3992/jgb.17.3.227
  6. Laali, A.; Nourzad, S.H.H.; Faghihi, V. (2022) “Optimizing Sustainability Performance of Infrastructure Projects Through the Integration of BIM and Envision at the Design Stage,” Sustainable Cities and Society, 84(September), 104013, DOI: 10.1016/j.scs.2022.104013
  7. Faghihi, V.; Peimankar, P.; Nazarpour, M.T.; Shafaat, A. (2022) “Effects of Contractual Challenges in Building Information Modelling for Successful Implementation.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, DOI: 10.1061/(ASCE)LA.1943-4170.0000554 
  8. Faghihi, V., Kim, A, & Ford, D.N. (2022), "Designing Sustainability Programs to Avoid and Escape the Capability Trap", Journal of Simulation, DOI: 10.1080/17477778.2022.2075804
  9. Hessami, A.R., Faghihi, V., Kim A., & Ford, D.N. (2020). "Evaluating Planning Strategies for Prioritizing Projects in Sustainability Improvement Programs", Journal of Construction Management and Economics, DOI: 10.1080/01446193.2019.1608369.
  10. Faghihi, V.; Reinschmidt, K.F.; Kang, J. (2018). "Extended Genetic Algorithm for Optimized BIM-based Construction Scheduling", Wiley StatsRef: Statistics Reference Online, DOI: 10.1002/9781118445112.stat07892
  11. Faghihi, V.; Reinschmidt, K.F.; Kang, J. (2016). "Objective-driven and Pareto Front Analysis: Optimizing Time, Cost, and Job-site Movements", Automation in Construction, Volume 69, September 2016, Pages 79-88, ISSN 0926-5805, DOI: 10.1016/j.autcon.2016.06.003
  12. Faghihi, V.; Nejat, A.; Reinschmidt, K.F.; Kang, J. (2015). "Automation in Construction Scheduling: a Review of the Literature", International Journal of Advanced Manufacturing Technology, Volume 81, Issue 9, Page 1845-1856 doi: 10.1007/s00170-015-7339-0
  13. Faghihi, V.; Hessami, A.R. and Ford, D.N. (2015). "Sustainability Improvement Program Design using Energy Efficiency and Conservation", Journal of Cleaner Production, Volume 107, 16 November 2015, Pages 400-409, ISSN 0959-6526,  doi: 10.1016/j.jclepro.2014.12.040
  14. Faghihi, V.; Reinschmidt, K.F.; Kang, J. (2014c). "Construction Scheduling Using Genetic Algorithm Based on Building Information Model", Expert Systems With Applications, 14(16), pp. 7565-7578. doi: 10.1016/j.eswa.2014.05.047
  15. Damnjanovic, I.; Faghihi, V.; Scott, C.; McTigue, E.; and Reinschmidt, K. (2013) "Educational Prediction Markets: A Construction Project Management Case Study", Journal of Professional Issues in Engineering Education and Practice, 139(2), pp. 134-138. doi:10.1061/(ASCE)EI.1943-5541.0000127
  16. Faghihi, V. and Vahdat, A. (2012) "Risk and Diversification in International Construction", The Business Review, Cambridge 20 (2): 95-102.
  17. Faghihi, S.V. and Vojoudi, M. (2008). “Introduction to virtual management in disaster management”, International Road and Structure Monthly Magazine, Year 6, No. 53.

     Under Review:

  1. Sadeghi, N. and Faghihi, V. (2021?). “BIM-based Energy Performance Evaluation of Building Envelope.” Indoor and Built Environment
  2. Sadeghi, N. and Faghihi, V. (2021?). “BIM Applications for Project Integration Management: A Literature Review.” Engineering, Construction, and Architectural Management

Conference Publications:

  1. Faghihi, V. (2021), "Applications of IoT in Construction Project Management", The 4th International Conference on BIM, Keynote Speaker, October, Tehran, Iran.
  2. Faghihi, V. (2020), "Exploring the Role of A.I. in Integrating Scheduling & Cost", Advancing Preconstruction, Speaker, November, Las Vegas, NV, USA.
  3. Faghihi, V. (2020), "Applications of VR & AR in Construction Project Management", The 3rd International Conference on BIM, Keynote Speaker, October, Tehran, Iran.
  4. Faghihi, V. (2019), "Practical Applications of BIM in Bridge Projects", The 2nd International Conference on BIM, Keynote Speaker, August, Tehran, Iran.
  5. Faghihi, V. (2018), "Practical Applications of BIM in Airport Projects", The 1st International Conference on BIM, Keynote Speaker, February, Tehran, Iran.
  6. Faghihi, V. and Kang, J. (2013), "SatraPM, A Customizable Web-Based Project Management Software", The 30th International Symposium on Automation and Robotics in Construction (ISARC 2013), IAARC, pp 9-16, August, Montréal, Canada. doi:10.22260/isarc2013/0002
  7. Lee, J.; Faghihi, V. and Kang, J. (2013), "Automatic Generation of Cobie Data from Revit", The 30th International Symposium on Automation and Robotics in Construction (ISARC 2013), IAARC, pp 653-660, August, Montréal, Canada. doi:10.22260/isarc2013/0071
  8. Kang, J.; Ganapathi Subramanian, A.; Lee, J. and Faghihi, V. (2012). "Robotic total station and BIM for quality control", eWork and eBusiness in Architecture, Engineering and Construction (Proceedings of the 5th European Conference on Product and Process Modelling in the Building and Construction Industry), July, Reykjavik, Iceland, pp. 717-722, doi:10.1201/b12516-113
  9. Kim, A.; Hessami, A.; Faghihi, V. and Ford, D. (2012). "Designing Perpetual Sustainability Improvement Programs for Built Infrastructures", The 30th International Conference of the System Dynamics Society, July, St. Gallen, Switzerland.
  10. Kang, J; Ryoo, B. and Faghihi, V. (2012) "Five Challenges You Need to Know for Successful BIM Application in Developing Countries", Third International Conference on Construction in Development Countries, July, Bangkok, Thailand.
  11. Faghihi, S.V. and Berjisiyan, M.J. (2009). “Implementation of SatraPM in project-based state organizations (IPDC case study)”, Proceedings of the 5th International Conference of Project Management, Aug., Tehran, Iran.
  12. Faghihi, S.V. (2008). “Optimizing power plant project management processes by using SatraPM”,4th International Conference of Project Management, Aug., Tehran, Iran.
  13. Faghihi, S.V. (2008). “Survey of traditional and virtual management in project procurement management”,Proceedings of the 2nd Project Procurement System, Feb. 4&5, Tehran, Iran.
  14. Faghihi, S.V. (2007). “Virtual management in construction projects (Survey of applying virtual management in 4th Fath Abad metro terminal)”,3rd International Conference of Project Management, Apr., Tehran, Iran.
  15. Besharati G., M.H. and Faghihi, S.V. (2006). “Implementation of virtual management in Iranian maritime projects”,Proceedings of the 2nd International Conference of Project Management, Mar., Tehran, Iran.
  16. Vojoudi, M. and Faghihi, S.V. (2005). “Traditional and virtual management in disaster management”,1st International Conference of Disaster Management, Nov., Tehran, Iran.

Under Preparation Papers:

  1. Damnjanovic, I.; Faghihi, V. (202?). "Prediction Game"
  2. Faghihi, V.; Kang, J. (202?). "BIM Application and Benefits on Small Projects (a case study)"

Other Publications/Presentations:

  1. Faghihi, V. (2014). "Automatic Construction Scheduling Inspired by Fetal Growth", Student Research Week, Texas A&M University
  2. Faghihi, V. (2014). "Automated and Optimized Project Scheduling Using BIM", Amirkabir Sustainable Transportation Infrastructure Center (ASSET Seminar Series), Amirkabir University of Technology, Tehran, Iran
  3. Faghihi, V. (2013). "BIM-based Construction Project Scheduling Using Genetic Algorithm", Seminar in Construction Engineering and Management Group, Sharif University of Technology, Tehran, Iran
  4. Faghihi, V. (2013). "BIM-based Construction Project Scheduling Using Genetic Algorithm", Construction Engineering Management Program, Amirkabir University of Technology, Tehran, Iran
  5. Faghihi, V. (2013). "BIM-based Automatic Construction Scheduling", BIM College Seminar, College of Architecture, Texas A&M University
  6. Faghihi, V. (2013). "Automatic Construction Scheduling Inspired by Fetal Growth", Student Research Week, Texas A&M University
  7. Faghihi, V. and Kang, J. (2012). "Benefits of Using BIM for Small Projects", BIM: Reality Check and Future Agenda
  8. Faghihi, V. and Kang, J. (2012). “BIM Efficiency in Projects Smaller than $5M”, PhD Student Research Poster Session in 2012 Construction Research Congress
  9. Sadegh-azar, M., (2007). “Equipping, Arranging and Economy of Construction Sites”, Master Plan Institute, (contribution: interviewing managers, collecting and translating unprocessed data)
  10. Rezaee A., (2006). “Basis of Workability”, Master Plan Institute, (contribution: final revisions) 



Back

SAVAFA © 2003-2024, All Rights Reserved.